The Eastbourne Road Pipe Diversion project aims to complete the stormwater pipe networks in the Eastbourne catchment area, significantly reducing the risk of flooding and stormwater overflows. Frequency was appointed as the project manager for the planning and design of this critical infrastructure project. The scope includes the installation of a new stormwater pipe, improving kerb and channel formations, and the installation of catchpits and inlets to better manage stormwater flow.